Hi Joseph, I use the composite by grade tool (drillhole/grade/grade) - here you can set the trigger value, the minimum average grade for the composite, and the amount of internal waste etc.
Taking it a bit further, you can calculate the point coordinates, so you can plot this in Vizex.
Merge in details from the collar and survey table, and then finish off with file/report generator to get a table which is ready to drop right into your document.
Hi Joseph, I use the composite by grade tool (drillhole/grade/grade) - here you can set the trigger value, the minimum average grade for the composite, and the amount of internal waste etc.
Taking it a bit further, you can calculate the point coordinates, so you can plot this in Vizex.
Merge in details from the collar and survey table, and then finish off with file/report generator to get a table which is ready to drop right into your document.
Steve
Many thanks Steve, i used the grade tool and it worked well for me, much appreciated. Cheers